Extension Of Time (IRE)
Lightly raced, with 1 archived start in May 2008 as a 4yo gelding. Finished 11 of 12 at Limerick last time. By Orpen (USA), whose progeny in our archive have won 9% of 4,038 runs since Jan 2008.
- 0–1Wins / Runs
- 0%Strike rate
- 0 (0%)Placed
- −1.00£1 level staken=1 at SP
KTB Speed and Rating
No KTB Speed figures for this horse. The engine scores GB and Irish racing from Oct 2016; runs elsewhere, or earlier, have no figure.
KTB Speed v1 · batch 15 Sep 2026 · GB & Irish racing only · 0 figures from 0 runs · a record, not a forecast
Both figures are KTB's own, computed from the archive; no vendor rating enters either. Every run's figure is on its form line below with its grade. Grades measure how much the archive could see, never the merit of the run.
Run style is derived from in-running commentary, which our data provider does not supply for this horse's races.
Pedigree intelligence
Progeny in our archive have won 9% of 4,038 runs since Jan 2008 (381 horses).
Weakest over 2m5f – 3m (all codes): 4.4% from 113.
| Going | Runs | Wins | SR | vs sire | This horse |
|---|---|---|---|---|---|
| Firm | 39 | 1 | 2.6% | −6.4 | — |
| Good to Firm | 438 | 40 | 9.1% | +0.1 | — |
| Good | 891 | 75 | 8.4% | −0.6 | 0 from 1 |
| Good to Soft | 501 | 36 | 7.2% | −1.8 | — |
| Soft | 720 | 74 | 10.3% | +1.3 | — |
| Heavy | 285 | 28 | 9.8% | +0.8 | — |
| Standard (AW) | 1,161 | 109 | 9.4% | +0.4 | — |
| Distance (all codes) | Runs | Wins | SR | vs sire | This horse |
|---|---|---|---|---|---|
| Under 6f | 242 | 27 | 11.2% | +2.2 | — |
| 6f – 7f | 1,314 | 135 | 10.3% | +1.3 | — |
| 1m – 1m1f | 1,013 | 93 | 9.2% | +0.2 | — |
| 1m2f – 1m4f | 543 | 35 | 6.4% | −2.6 | — |
| 1m5f – 2m | 511 | 49 | 9.6% | +0.6 | 0 from 1 |
| 2m1f – 2m4f | 286 | 19 | 6.6% | −2.4 | — |
| 2m5f – 3m | 113 | 5 | 4.4% | −4.6 | — |
| Over 3m | 16 | 1 | 6.3% | −2.7 | — |
Flat and jumps together (all codes) · since Jan 2008 · as at 4 Nov 2026 · rows under 30 runs muted · win % is the measure, a record not a forecast
2 siblings in the archive, 2 winners — best of them Quiet Times (IRE) (3 wins).
The wins came over 6f–2m; the highest grade won is Class 2 (Quiet Times (IRE)).
| Produce | Runs | Wins | Win trips | Best grade |
|---|---|---|---|---|
| Quiet Times (IRE) | 27 | 3 | 6f | Class 2 |
| Lowsha Green (GB) | 12 | 1 | 2m | Class 3 |
Too few runs for meaningful splits. The full record is below.
Form
| Date | Course | Race | Pos | Btn | Wgt | KTB | Jockey | SP |
|---|---|---|---|---|---|---|---|---|
| 2008 · 1 run | ||||||||
| 05 May 08 | Limerick | Riverfest (pro-am) Inh Flat Race | 11/12 | 30 | 11-0 | 70C | Mr A J Hogan | 6/1 |
Quick answers
- How many races has Extension Of Time won?
- Extension Of Time (IRE) has yet to win, from 1 archived start in 2008.
- Who trained Extension Of Time?
- Extension Of Time (IRE) was trained by T Hogan on the most recent run on record, at Limerick on 5 May 2008.
- Who is Extension Of Time's sire?
- Extension Of Time (IRE) is by Orpen (USA) out of Super Times (GB), whose sire is Sayf El Arab.
- What is Extension Of Time's sire's record?
- Orpen (USA)'s progeny in our archive have won 9% of 4,038 runs since Jan 2008 (381 horses), Flat and jumps together. Weakest over 2m5f – 3m (all codes): 4.4% from 113.
- Who are Extension Of Time's siblings?
- Out of Super Times (GB), Extension Of Time (IRE) has 2 other produce in our archive, 2 of them winners. Most wins: Quiet Times (IRE) (3). Highest grade won: Class 2 (Quiet Times (IRE)). The wins came over 6f–2m. As at Nov 2026.