Skip to content
6:50

Afm Services Data Centre Construction Handicap

Kempton (AW) · 10 December 2008
  • TypeFlat
  • ClassClass 5
  • Distance5f
  • GoingStandard
  • SurfaceAW
  • Runners12
  • HandicapYes

Bookiesindex Boy (GB) (9/1) won the Afm Services Data Centre Construction Handicap at Kempton (AW) on 10 December 2008, beating Thoughtsofstardom (GB) by half a length under Stevie Donohoe for trainer J R Jenkins. 12 ran on Standard going over 5f; the winning time was 59.48s (slow by 0.58s). The 2/1 favourite, Musical Script (USA), finished 3rd, beaten 1¼ lengths.

On the record: how often the favourite wins in a field of 12 — The market

Won by half a lengthFav: Musical Script (USA) 2/1 · 3rd
Pos Dr Horse Btn Jockey Trainer Wgt ORKTB Time Prize SP
1st 4 Bookiesindex Boy (GB) v 4g Stevie Donohoe J R Jenkins 8-12 6985A 59.48 2,590.40 9/1
2nd 2 Thoughtsofstardom (GB) 5g ½ Luke Morris(3) Phil McEntee 8-1 5872A 59.56 770.80 6/1
3rd 1 Musical Script (USA) b 5g ¾ Dane O'Neill Mouse Hamilton-Fairley 8-12 6380A 59.69 385.20 2/1 fav
4th 10 Hereford Boy (GB) b 4g 1½ James O'Reilly(5) Dean Ivory 8-13 7574A 59.94 192.40 18/1
5th 12 Bertie Southstreet (GB) 5g hd Martin Dwyer Jim Boyle 8-8 6568A 1:00.01 — 20/1
6th 7 Step It Up (IRE) 4g ½ Steve Drowne Jim Boyle 8-10 6768A 1:00.06 — 9/1
7th 6 Wreningham (GB) 3g nse Jimmy Quinn Tom Keddy 8-5 6263A 1:00.07 — 14/1
8th 3 Woodcote (IRE) tv 6g nk George Baker Patrick Chamings 9-3 7473A 1:00.10 — 7/2
9th 9 Monsieur Reynard (GB) 3g ½ Michael Metcalfe(5) Milton Bradley 8-3 6557A 1:00.19 — 28/1
10th 5 Caribbean Coral (GB) 9g nse Graham Gibbons Andrew Haynes 8-11 7565A 1:00.20 — 50/1
11th 8 Matterofact (IRE) 5m 2½ Paul Doe Malcolm Saunders 8-5 6248A 1:00.60 — 25/1
12th 11 Desert Opal (GB) b 8g 2½ Liam Jones Conor Dore 8-10 6742A 1:01.02 — 16/1

Winning time 59.48s (slow by 0.58s)

KTB figures KTB Rating v1 · batch 3 Oct 2026 — what each horse ran to in this race, in pounds on the official-rating scale (12 of 12 runners have a figure). GB & Irish racing only · figures as at 4 Oct 2026 · a record of the race, not a forecast.

In-running commentary is not available from our data provider for this period.

Quick answers

Who won the Afm Services Data Centre Construction Handicap at Kempton (AW) in 2008?
Bookiesindex Boy (GB) won the Afm Services Data Centre Construction Handicap at Kempton (AW) on 10 December 2008, ridden by Stevie Donohoe and trained by J R Jenkins.
What was the finishing order of the 2008 Afm Services Data Centre Construction Handicap at Kempton (AW)?
1st Bookiesindex Boy (GB) (9/1), 2nd Thoughtsofstardom (GB) (6/1), 3rd Musical Script (USA) (2/1F).
What price was the winner of the 2008 Afm Services Data Centre Construction Handicap at Kempton (AW)?
Bookiesindex Boy (GB) returned a starting price of 9/1.
How many horses ran in the 2008 Afm Services Data Centre Construction Handicap at Kempton (AW)?
12 horses ran in the 2008 Afm Services Data Centre Construction Handicap at Kempton (AW).
What was the winning time of the 2008 Afm Services Data Centre Construction Handicap at Kempton (AW)?
The winning time was 59.48s (slow by 0.58s).