AFM Services Data Centre Construction Handicap
- TypeFlat
- ClassClass 6
- Distance1m 2f
- GoingStandard
- SurfaceAW
- Runners13
- HandicapYes
Mr Napoleon (IRE) (11/2) won the AFM Services Data Centre Construction Handicap at Kempton (AW) on 12 December 2007, beating Wind Flow (GB) by half a length under George Baker for trainer Gary Moore. 13 ran on Standard going over 1m 2f; the winning time was 2m 6.57s (slow by 2.37s). The 7/2 favourite, Wind Flow (GB), finished 2nd, beaten half a length.
On the record: how often the favourite wins in a field of 13 — The market
| Pos | Dr | Horse | Btn | Jockey | Trainer | Wgt | OR | KTB | Time | Prize | SP |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1st | 7 | Mr Napoleon (IRE) 5g | George Baker | Gary Moore | 9-2 | 55 | 72C | 2:06.57 | 2,047.50 | 11/2 | |
| 2nd | 11 | Wind Flow (GB) b 3g | ½ | J F Egan | Chris Dwyer | 8-11 | 53 | 66C | 2:06.65 | 604.50 | 7/2 fav |
| 3rd | 13 | Charlottebutterfly (GB) 7m | shd | Robert Havlin | Philip McBride | 9-1 | 54 | 70C | 2:06.65 | 302.40 | 14/1 |
| 4th | 1 | Always Sparkle (CAN) 3g | 1½ | Chris Catlin | Bryn Palling | 8-13 | 55 | 65C | 2:06.90 | — | 25/1 |
| 5th | 5 | Shunkawakhan (IRE) p 4g | 1 | Tolley Dean(5) | G C H Chung | 8-5 | 49 | 55C | 2:07.07 | — | 12/1 |
| 6th | 4 | Mythical Charm (GB) t 8m | ½ | Jack Dean(7) | John Bridger | 8-8 | 54 | 56C | 2:07.15 | — | 16/1 |
| 7th | 8 | Bowl of Cherries (GB) b 4g | nk | Dane O'Neill | Ian Wood | 9-1 | 54 | 62C | 2:07.24 | — | 8/1 |
| 8th | 3 | Danelor (IRE) p 9g | 1 | Oscar Urbina | Derek Shaw | 8-11 | 50 | 56C | 2:07.40 | — | 25/1 |
| 9th | 12 | Theatre Royal (GB) p 4f | nk | Neil Chalmers(3) | Mouse Hamilton-Fairley | 8-8 | 50 | 52C | 2:07.44 | — | 20/1 |
| 10th | 2 | Glenridding (GB) 3g | 5 | Tom Queally | James Given | 8-13 | 55 | 46C | 2:08.28 | — | 9/1 |
| 11th | 10 | Shaheer (IRE) v 5g | hd | Greg Fairley | John Gallagher | 8-11 | 50 | 44C | 2:08.35 | — | 4/1 |
| 12th | 14 | High Class Problem (IRE) 4g | 5 | Jim Crowley | Peter Winkworth | 9-1 | 54 | 38C | 2:09.15 | — | 12/1 |
| 13th | 6 | Jarvo (GB) 6g | 3 | Andrew Elliott(3) | Ian McInnes | 8-11 | 53 | 34C | 2:09.65 | — | 14/1 |
Quick answers
- Who won the AFM Services Data Centre Construction Handicap at Kempton (AW) in 2007?
- Mr Napoleon (IRE) won the AFM Services Data Centre Construction Handicap at Kempton (AW) on 12 December 2007, ridden by George Baker and trained by Gary Moore.
- What was the finishing order of the 2007 AFM Services Data Centre Construction Handicap at Kempton (AW)?
- 1st Mr Napoleon (IRE) (11/2), 2nd Wind Flow (GB) (7/2F), 3rd Charlottebutterfly (GB) (14/1).
- What price was the winner of the 2007 AFM Services Data Centre Construction Handicap at Kempton (AW)?
- Mr Napoleon (IRE) returned a starting price of 11/2.
- How many horses ran in the 2007 AFM Services Data Centre Construction Handicap at Kempton (AW)?
- 13 horses ran in the 2007 AFM Services Data Centre Construction Handicap at Kempton (AW). Non-runners: Raydan (vet's certificate).
- What was the winning time of the 2007 AFM Services Data Centre Construction Handicap at Kempton (AW)?
- The winning time was 2m 6.57s (slow by 2.37s).